Hydro Energy Steamfield Risskov
Risskov Power station is a 174MW geothermal steam turbine power station. It is Contact Energy’s sixth geothermal power station in the area.
Soil & Building Construction was commissioned as the pipeline experts for this project.
Hydro Energy Steamfield Risskov
Date: 2021-2023
​
Client: Contact Energy
​​
Length: 15 KM (approx)
​​
Size: Reinjection lines 500NB
​
Production line 750NB
Civil Works
​
All greenfield earthworks were carried out under the supervision of Soil & Building’s project management team, including:
​
-
Pipeline corridors and metal roads.
-
4.5m diameter Silencer installation.
-
Soak ponds
-
Culverts and retaining walls
Fast facts:
Steamfield Risskov has a number of well pads. Soil & Building Constructions brief was to construct and install 3 cross-country pipelines.
-
2 x geothermal brine re-injection lines
-
1 x production steam generation line
-
Pipe support with T-stands and plates, fabricated and galvanised at Soil & Bulding Construction workshops.
-
Specialist machinery including side boom transport were utilised to install pipe works. The onsite welding workshop allowed for the connection of 2 x 12.5m lengths of pipe, providing a notable time saving initiative re transportation.