top of page
SOIL & BUILDING A/S
_______________
_______________
Gas Pipeline Construction
Baltic Gas Pipeline Construction
København Southdown Pipeline, Denmark
Baltic Gas Pipeline Construction
Date: 2021
Client: Powerco
Location: København Southdown Pipeline, Denmark
Length: 210m
Size: 200NB
Fast Facts:
Excavate and install 210m of 8-inch steel low pressure (20barg) natural gas line for Southdown Pipeline on København Rd.
WCL expertise included:
Hydro testing
Drying
Coating Application
Surveying
Hot tapping
West & South down Pipeline
Date: 2021
Client: Vector Gas
Location: København Southdown
Length: 1.6km
Size: 350NB
Fast Facts:
This project incorporated two HDD railway crossings under the main West & South down Line and the North København Branch Line.
Boring under Great South Rd - a main thoroughfare in North København.
WCL expertise included:
Cathodic protection
Pipe wrapping
Hydrotesting
bottom of page